Past projects

Our past work includes crew transport in Morowali and antenna towers at PLTA Larona. These examples do not imply current contracts or client endorsement.

By kind of work

  • Crew bus for PT. Merdeka Tsingshan Indonesia
    Transport

    Crew buses, Bahodopi

    Crew transport, operators and maintenance staff for PT. Merdeka Tsingshan Indonesia.

  • Steel plate and pipe stock for PT. Merdeka Tsingshan Indonesia
    Fabrication

    MoC maintenance, MTI

    Fabricated material for PT. Merdeka Tsingshan Indonesia's maintenance project.

  • Pujasera Wasuponda container building and tent roof
    Construction

    Pujasera Wasuponda

    Construction in PT. Vale Indonesia's community empowerment area.

  • Tronton hauling a large steel pipe section, PT. Merdeka Tsingshan Indonesia
    Transport

    Logistics & hauling, MTI

    Freight transport and hauling for PT. Merdeka Tsingshan Indonesia.

  • Row of red dump trucks, PT. Merdeka Mining Service hauling
    Transport

    Hauling

    Hauling for PT. Merdeka Mining Service.

  • Inspecting an electric motor, PT. Merdeka Tsingshan Indonesia
    Fabrication

    Repair and manufacturing

    Fabrication and repairs for PT. Merdeka Tsingshan Indonesia.

  • Container modules lifted by crane, Pujasera Wasuponda
    Construction

    Pujasera assembly

    Container modules lifted into place during the Pujasera Wasuponda build.

  • Trailer loaded with containers
    Transport

    Jetty Labota

    Trailer and mixer truck rental for PT. China Harbour Indonesia.

  • Machined shaft ends
    Fabrication

    Machined parts

    Parts from fabrication and repair work for PT. Merdeka Tsingshan Indonesia.

  • Conveyor rollers
    Fabrication

    Conveyor rollers

    Rollers from WIM’s fabrication and repair work for MTI.

Supply and construction contracts

These past contracts are listed in the WIM company profile.

30 m × 2Radio antenna towers, fabricated and installedPLTA Larona, PT. Vale Indonesia Tbk.
Oct 2018Vendor Held Stock 06, fasteners, five-year termPT. Vale Indonesia Tbk.
Mar 2020Vendor Held Stock 55, bin utility and household, five-year termPT. Vale Indonesia Tbk.
Sep 2020Disinfectant supply agreement, two-year termPT. Vale Indonesia Tbk.
4,000 kgLincoln welding wire for the PLTA Larona shutdownPT. Leighton Constructions Indonesia Tbk.

What does your project need?

Use the form or call our office to discuss the work and your schedule.